Bridge work will required lane closures on SB I-75 in Ohio - Cincinnati News, FOX19-WXIX TV

Bridge work will required lane closures on SB I-75 in Ohio

Bridge work will require nightly lane closures on southbound Interstate 75 from Ezzard Charles Drive to the Eighth Street ramp through June 22.  

The schedule is as follows:

Monday, June 13: The left lane will close at 7 p.m., followed by closure of the left center lane at 10 p.m. All lanes will reopen to traffic by 6 a.m. the following day. These closures will be in effect until Wednesday, June 15.

Thursday, June 16: The right lane will close at 7 p.m., followed by closure of the right center lane at 10 p.m. All lanes will reopen to traffic by 6 a.m. the following day. These closures will be in effect through Wednesday, June 22.

Wednesday, June 15: Construction on the Linn Street overpass will be moved from the outside to the inside lanes, at which time the overpass sidewalks will reopen.

Arrow boards and signs will be in place prior to the work zone to alert motorists of the upcoming lane closures.

To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.

Powered by Frankly