Revive the Drive - NKY project ramp closure schedule Campbell Co - Cincinnati News, FOX19-WXIX TV

Revive the Drive - NKY project ramp closure schedule

Photo courtesy of the Kentucky Transportation Cabinet web site. Photo courtesy of the Kentucky Transportation Cabinet web site.

The Kentucky Transportation Cabinet has announced that beginning Friday, May 25, several ramps will be closed as part of the Revive the Drive - NKY project.

7 PM: traffic will be down to one lane from just north of the US 27 interchange across the Daniel Carter Beard Bridge to the Ohio State line. Lanes will re-open on Sunday, May 27, at 6 AM.

8 PM: I-471 NB exit ramp (Exit 1B) to I-275 WB will be closed. Traffic will be detoured to continue on I-471 NB to US 27 (Exit 2) and back onto I-471 SB to I-275 WB.

  • Other suggested alternative routes: KY 9 (AA Highway) to I-275 WB

This ramp will re-open on Monday, June 4, at 6 AM.

8 PM: I-471 NB exit ramp to KY 8 (Exit 5) will be closed. Traffic will be detoured to use Exit 4 to west on KY 1120 (Memorial Parkway) to north on US 27 (Monmouth St) to KY 8. This ramp will reopen on Monday, June 18th, at 6 AM.

8 PM: KY 8 entrance ramp to I-471 NB will be closed. Traffic will be detoured to I-471 SB to Exit 4 (Memorial Parkway) and back onto I-471 NB. This ramp will re-open on Monday, June 18, at 6 AM.

Keep in mind that traffic on I-471 NB is currently restricted to two lanes and is in a shifted position with both shoulders closed.

Throughout the duration of this project, traffic may be reduced to a single lane during the night time periods between 10 PM-5 AM.

Copyright 2012 FOX19. All Rights Reserved.

 

Powered by Frankly