Second Street ramp to NB I-71 set to close for 60 days - Cincinnati News, FOX19-WXIX TV

Traffic

Second Street ramp to NB I-71 set to close for 60 days

CINCINNATI, OH (FOX19) -

As the Lytle Tunnel project continues, there will continue to be additional ramp and lane closures on Interstate 71 over the length of the project. 

The ramp from Second Street to northbound I-71 is set to be closed at 10 p.m. Tuesday

The ramp will be closed for 60 days, approximately September 7.

The detour will be Main Street to the Fifth Street ramp to I-71.

Two lanes of northbound I-71 traffic will be maintained.

Copyright 2016 WXIX. All rights reserved. 

Powered by Frankly