Clay Wade Bailey Bridge lane closures scheduled - Cincinnati News, FOX19-WXIX TV

Clay Wade Bailey Bridge lane closures scheduled

COVINGTON, KENTUCKY (FOX19) -

Crews will doing utility work daily this week on the Clay Wade Bailey Bridge. 

They will be closing the westbound lane of the Clay Wade Bailey Bridge (U.S. 127) each day this week from 9 a.m. to 2:30 p.m.

The closures will run from Monday, December 12 through Friday, December 16. 

To avoid delays use, Second Street to the Suspension Bridge to head south into Covington.

Signs will be posted and the traffic will be maintained, just expect slight delays.

All work is weather permitting.

Copyright 2016 WXIX. All rights reserved.

Powered by Frankly